Horse TackHalters or LeadsLeadsShires Extra Long Lead Rope - Blue

Shires Extra Long Lead Rope - Blue

Product ID: 24417

$11.99

Technical Specifications

PropertySpecification

Color:
Blue
Size:
One Size
In Stock!

Time to Ship: Usually ships in 5 - 7 business days.

Quantity

Technical Specifications

PropertySpecification

Product Description

100% Secure
Checkout

Product description

The Shires Extra Long Lead is 3 meters, with a brass swivel trigger clip.

At nearly 10ft, this lead is useful for rope work and other in hand training.

Features:

  • 3 meter lead
  • Brass swivel trigger clip
  • Variety of colors