Horse TackHalters or LeadsLeadsShires Extra Long Lead Rope - Black
FAST
-25%

Shires Extra Long Lead Rope - Black

Product ID: 24416

$9.74

Was $12.99

Technical Specifications

PropertySpecification
Announcements
Please note Lead Rope colors may not exactly match Halter colors unless sold as a set.

Color:
Black
Size:
One Size
In Stock!

Time to Ship: Usually ships in 3 - 5 business days.

Quantity

Technical Specifications

PropertySpecification
Announcements
Please note Lead Rope colors may not exactly match Halter colors unless sold as a set.

Product Description

100% Secure
Checkout

Product description

The Shires Extra Long Lead is 3 meters, with a brass swivel trigger clip.

At nearly 10ft, this lead is useful for rope work and other in hand training.

Features:

  • 3 meter lead
  • Brass swivel trigger clip
  • Variety of colors